BEDROOM


The ceiling tiles were such a pain to fix, I took the ones I could salvage from the living room ceiling and pulled down all the rotton ones here. They do not fit together nicely. It is meant to be installed from left to right, so they interlock. I used screws and joint compound to cover them. The ceiling I primed twice and painted; it still showed stains through; so I had to buy a 1" nap roller, and prime again; THICKLY and let it dry for a day, then painted again.
 
A crew (not me) installed the new windows. They left me a hell of a mess. jerks.

I think this must've been a clothesline in here? YUCK. look at the stains in the closet (on right) SO GROSS!!! heheheh.
 
I found this door (the glass one) in the celler, and frosted the glass. had to trim the bottom to make it fit.

 

This carpeting wasn't even stuck to the floor. and had three different colors/styles patched in there.
 
Berber (sp?)

 
This closet door was also found downstairs. (he had removed them I take it)
p.s. I did not cut that door!

My second biggest challenge; YEY. (first being the back door)